Skip to main content
Operating log· public record

What shipped. What broke.

A small service is best evaluated by the record it leaves behind. Every change to the service, every internal review, every incident lands here in the order it happened. Nothing is rewritten after the fact.

Last entry · 13 May 2026

April 2026

6 entries
  1. Documentation

    Founder review pass — five documentation decisions logged.

    Pass across the legal and marketing surface. Five decisions filed: demo-route privacy, trust-page scope, canonical deployment timeline, refund-language canonicalization, SLA target value. Drift guards added so the wording can't regress during future edits.

  2. Design

    Hero visual revision.

    New dome composition on the home hero. Tightened the opening message; reduced-motion preference is honored — the motion is cosmetic, never load-bearing for comprehension.

  3. Documentation

    Trust & Security page rewritten for legal and procurement.

    Six-card executive-reassurance format. DPA and sub-processor links go direct. Earlier drafts exposed implementation details; this revision is scoped to commitments a reviewer can sign off on.

  4. Documentation

    Copy review across pricing and methodology.

    Eleven phrases removed that had drifted from the approved register (e.g. product-framing words Loomaru doesn't use about itself). The approved phrase list is now enforced by a build-time check — regressions break CI.

  5. Design

    Cookie-preferences UI neutralized.

    Both action buttons on the consent banner are rendered as outline — no filled CTA anywhere in the consent flow. Aligns the surface with the privacy register the rest of the site keeps.

  6. Operational

    Uptime monitoring cutover complete.

    External probe cycle verified end-to-end. First root-cause note template filed so that when an incident happens, the communication artifact exists before it's needed.

March 2026

4 entries
  1. Design

    WCAG 2.1 AA review pass on the report surface.

    Contrast and focus-visible fixes across the analysis page. Baseline accessibility snapshot archived so regressions are detectable on the next visual-diff run.

  2. Documentation

    Deployment timeline extracted to a single canonical source.

    Every page that states a duration now reads from one constant. Before this, three surfaces had slightly different numbers — a small drift that compounds credibility cost over time. Fixed at the source.

  3. Terms update

    Guarantee language consolidated.

    One sentence, one source, identical wording on hero, pricing, Terms, and FAQ. A drift guard blocks re-introduction of competing phrasings.

  4. Bug fix

    Two-minute status-page flicker during a deploy.

    Cause: stale cache node served a pre-deploy response briefly after the new build went live. Purge resolved it inside two minutes. Zero merchant-facing impact. Root-cause note filed; deploy procedure updated to purge pre-emptively.

How this page works

Technical detail is kept off this page on purpose — a public log shouldn't double as a map for attackers. For full depth or our sub-processor list, email vadim@loomaru.com.